WORK PROGRESS

 

BLOCK A

  • Second floor, forming of slab and beam to receive reinforcement in progress.

BLOCK B

  • Setting of blocks on first floor ongoing.

BLOCK C

  • Second floor, Ironwork, Electrical, and plumbing work ongoing ready to receive casting.

BLOCK D

  • Taking of the level at unit 5 ongoing to receive formwork for first-floor slab.

 

 

APPENDIX

white avenue color code

  • Block A- picture showing Block A.

color code

  • Block BSetting of blocks on first floor ongoing.

color code

  • Block C- picture of block.

Block D- Taking of the level at unit 5 going on to receive is first floor.