APPENDIX

PICTURE SHOWING BLOCK A

Glendale pearl Abuja

PICTURE SHOWING BLOCKWORK ON SECOND FLOOR SLAB AT BLOCK B

Glendale Pearl

PICTURE SHOWING CONCRETE CASTING TO SECOND FLOOR SLAB AT BLOCK C

Glendale pearl

PICTURE SHOWING BLOCKWORK AND PARTITION WALL ON THIRD FLOOR SLAB AT BLOCK D

Glendale pearl

PICTURE SHOWING FORMWORK AND SHUTTERING FOR THIRD FLOOR SLAB AT BLOCK E

BLOCK A

  • External Electrical Piping down (external).                                        95%
  • Formwork and Shuttering of Third Floor Extension Column.        100%
  • Roof Beam Formwork and Shuttering                                                  90%
  • Concrete Casting to Roof Beam Formwork (In view).

BLOCK B

  • Formwork and shuttering to Second Floor Slab                               100%
  • Slab Reinforcement Arrangement (Laying and Tieing)                  100%
  • Concrete Casting to Second Floor Slab                                               100%
  • Blockwork on Second Floor slab                                                           20%

BLOCK C

  • Slab reinforcement arrangement (Second Floor)                            100%
  • Concrete Casting to Second Floor Slab                                               100%
  • Blockwork on Second Floor Slab (In View)

BLOCK D

  • Blockwork and Partition wall on Third Floor Slab                         100%
  • Roof Beam Formwork and Shuttering (In View).

BLOCK E

  • Formwork and Shuttering for Third Floor Slab                              90%
  • Reinforcement to Third Floor Slab (In View).

 

 

 

SUMMARY OF STATE OF WORK

  • Roof Beam Formwork and Shuttering 90%                                                (Block A)
  • Formwork and Shuttering of Third Floor Extension Column 100%     (Block A)
  • Formwork and Shuttering to Second Floor Slab 100%                            (Block B)
  • Slab Reinforcement arrangement (Laying and Tieing) 100%                (Block B)
  • Slab Reinforcement arrangement (Second Floor) 100%                         (Block C)
  • Concrete Casting to Second Floor Slab 100%                                            (Block C)
  • Blockwork and Partition Wall on Third Floor Slab 100%                       (Block D)
  • Reinforcement to Third Floor Slab (In View).                                           (Block E)

 THANK YOU.