SITE ACTIVITY REPORT FOR THE MONTH OF MAY 2021 (GLENDALE PLUS, ABUJA)

PICTORIAL VIEW OF GLENDALE PLUS STATE OF WORK APPENDIX PICTURE SHOWING COMPLETED WALL PAINTING ON BLOCK A   PICTURE SHOWING A COMPLETED WINDOW HOOD AND WALL BELT FITTINGSAT BLOCK B.   PICTURE SHOWING COMPLETED WALL PAINTING ON BLOCK C   PICTURE SHOWING BLOCK D   [...]

SITE ACTIVITY REPORT FOR THE MONTH OF MAY 2021 (COLOR CODE ESTATE, ABUJA)

APPENDIX Block A- Ironwork on lintel ongoing. Block B - Second-floor slab forming ongoing. Block C- Ironwork on roof beam ongoing. Block D- First-floor slab iron complete. WORK PROGRESS Block A. Blockwork ongoing on the second floor and the master bedrooms are modified. Nailing of lintel [...]

By |2021-05-26T11:12:34+00:00May 26th, 2021|Commercial, Mortgage, Real Estate, realtor, Residential|0 Comments

SITE ACTIVITY REPORT FOR THE MONTH OF APRIL 2021 (CEDARWOOD CITY, ABUJA)

Phase 1 Report APPENDIX LOT 11- Reinforcement work completed Lot 12- Parapet wall is 100% done. Picture showing the bridge Picture showing the Park. Picture showing water Fountain Picture showing the Gatehouse WORK SUMMARY LOT – 7: Window dressing and divider Wall [...]