SITE ACTIVITY REPORT FOR THE MONTH OF APRIL 2021 (GLENDALE PEARL, ABUJA)

APPENDIX PICTURE SHOWING BLOCK A PICTURE SHOWING BLOCKWORK ON SECOND FLOOR SLAB AT BLOCK B PICTURE SHOWING CONCRETE CASTING TO SECOND FLOOR SLAB AT BLOCK C PICTURE SHOWING BLOCKWORK AND PARTITION WALL ON THIRD FLOOR SLAB AT BLOCK D PICTURE SHOWING FORMWORK AND SHUTTERING FOR [...]

GLENDALE PLUS SITE ACTIVITIES FOR THE MONTH OF NOVEMBER 2020

  PICTORIAL VIEW OF GLENDALE PLUS STATE OF WORK  BLOCK A  Wall painting (external)                                                              30%  Tyrolean wall finishes                                                                  95%  External wall screeding                                                              100%  Installation of staircase balustrade                                          100%  Plastering of internal wall                                                          100%  Plastering of external wall                                                         100%  Electrical piping on each floor                                                   100%  Electrical wiring on each floor                                                   100%  Plumbing work on each floor                                                    [...]

By |2020-12-03T09:00:31+00:00December 3rd, 2020|Uncategorized|0 Comments
Go to Top