SITE ACTIVITY REPORT FOR THE MONTH OF APRIL 2021 (GLENDALE PEARL, ABUJA)

APPENDIX PICTURE SHOWING BLOCK A PICTURE SHOWING BLOCKWORK ON SECOND FLOOR SLAB AT BLOCK B PICTURE SHOWING CONCRETE CASTING TO SECOND FLOOR SLAB AT BLOCK C PICTURE SHOWING BLOCKWORK AND PARTITION WALL ON THIRD FLOOR SLAB AT BLOCK D PICTURE SHOWING FORMWORK AND SHUTTERING FOR [...]

Go to Top